Al Maktoum International Airport

The project involves an airport city with six runways and terminal facilities, which accommodate 160 million annual passengers, 10 million tons of cargo, and a Logistics City.

Phase 1 of the Dubai World Central Al Maktoum International Airport is completed and fully operational. The international airport currently has the capacity to handle 600,000 tonnes per annum and operates 24 hours a day on an A380-compatible, 4.5 km runway. Facilities include 64 aircraft stands, a state-of-the-art ATC Tower, fire stations, line maintenance services, a fuel farm and a 710,418 sq ft, single-level passenger terminal.

  • Dubai Civil Aviation Authority (DCAA)
  • Leslie Jones Architecture
  • Kharafi National (CUC Contractor)
    Aeradio (Meteorological Systems)
    Northropp Grumman (Radar Operations)
    Thermo L.L.C. (Fuel Farm)
    Amana Steel (Fuel Farm)